Home / Product / Sub Clarifications
Feature 03 · Starter + Pro

Sub Clarifications

Every gap on your sheet becomes a specific question for the sub who left it out, drafted and ready for you to send.

What it means

A bid clarification is a written question asking a sub to confirm whether a specific item is in their price, and to add it if not, before you finalize your number.

Sub A0Sub B3Sub C1
SubjectBid clarification · Drywall & framing

Thanks for your proposal. Before we can level it, please confirm whether the following are included, and add pricing if not:

  1. Shaftwall at elevator A-501/4
  2. Firestopping at rated partitions 07 84 00
  3. Blocking for millwork A-610

Please reply by Thursday so we can finalize the bid.

SendEditCopy
Why it matters

Vague questions get vague answers.

"Please confirm your scope is per plans and specs" gets back "yes, per plans and specs." Then the shaftwall still isn't in the number.

A question that names the item and points to the sheet is hard to dodge. The sub has to look, and either confirm it's included or send a price.

Writing those questions by hand for every sub on every trade is what eats bid week. ArcSpecs drafts them from the gaps it already found.

The usual email

  • "Please confirm your scope is complete"
  • Same message sent to every sub
  • Answer: "Per plans and specs"

A ArcSpecs clarification

  • Lists only that sub's gaps
  • Each item has its sheet or spec reference
  • Answer: "Included" or a number
How it works

Gaps in, questions out.

01

Gaps become questions

Every flagged item from Bid Leveling (and Scope Check on Pro) becomes a plain question with its reference attached.

02

One email per sub

Each sub gets a draft listing only their gaps. A sub with nothing missing gets nothing.

03

You review and send

Edit the wording, set your reply-by date, and send from your own email. Nothing goes out on its own.

What you get

Questions subs can actually answer.

Drafts

One email per sub

Only their gaps, numbered, ready to send or copy into your usual email.

References

Sheet and spec on every item

Subs can find the item in seconds, so you get answers before bid day.

Control

You send it

Edit anything before it goes. It comes from you, in your words, to subs you already work with.

Questions

About clarifications.

Does it email my subs automatically?

No. ArcSpecs drafts the emails and you decide what goes out. Send, copy into Outlook, or edit first.

Can I change the wording?

Yes. Every draft is editable, and you can set your own reply-by date and tone.

Does it track replies?

Not yet. Replies come back to your inbox like any other email, and you update the sheet when a sub confirms or sends a price.

Which plan includes it?

Sub Clarifications is in every plan. On Pro, gaps from the Scope Check are included in the drafts too.

Previous feature← Scope Check NextSee pricing →

Try it on your next bid package.

We're taking a few commercial GCs in Dallas–Fort Worth into the founder program, with early access and a locked-in rate.

Join the founder program